LDR   01097nkm^^22002653a^4500
001        CC00004499_00001
005        20230124072256.0
006        m^^^^^o^^c^^^^^^^^
007        cr^^n^---ma^mp
008        230124n^^^^^^^^xx^nnn^^^^^^^^o^^^^neng^d
245 00 |a 20080129010 - Instructional Building Replacement Project Gets Underway |h [electronic resource].
260        |c 9/1/1999.
500        |a In preparation for the construction of the new instructional building known as IBRP (later named Washington Hall), old buildings are demolished and moved; the building is now located on Washington Avenue between Pear Street and Walnut Street
506        |a All rights reserved Centralia College.
533        |a Electronic reproduction. |c Centralia College, |d 2023. |f (Centralia College) |n Mode of access: World Wide Web. |n System requirements: Internet connectivity; Web browser software.
535 1    |a Centralia College.
650        |a Campus Grounds.
650        |a Washington Hall (2001-).
655    4 |a image.
830    0 |a Centralia College.
830    0 |a Photographs.
852        |a Centralia |c Photographs
856 40 |u https://centralia.sobeklibrary.com/CC00004499/00001 |y Electronic Resource
992 04 |a https:/centralia.sobeklibrary.com/content/CC/00/00/44/99/00001/5350-3730thm.jpg
997        |a Photographs


The record above was auto-generated from the METS file.